Get the coupon in the end of description.
Description
Language : Urdu/Hindi
Product Cost By CO-Production Order
The scenario, without quantity structure costing method is used when a material master exists for a product, but a bill of material (BOM) and routing do not. For example, you can use this costing method for products that are still in the prototype phase, but for whom a product cost is required.
You can also use this method for valuating intangible goods such as services for which there is no BOM or routing. With this method you can carry out a cost for materials even if the quantity structure data (such as BOMs and routings) is located in a non-SAP Production Planning system.
Introduction & Configuration
Introduction & Configuration
Material Master & Production Process
Create Material Master (Raw Material & Finished Good)
Alternative Of BOM & Routing & Execute Cost Estimate Of FG Material
Create CO Production Order
Preliminary Cost Of CO Production Order
Raw Material Stock In
Raw Material Issue To CO Production Order
Activity Type Confirmation to CO Production Order
Goods Received Against CO Production Order
Sales Process
Create Sales Order
Delivery, Picking & Post Goods Issue
Billing
Closing
Calculate Variance
Settlement Of CO Production Order
Material Ledger – Actual Costing Run
T-Codes
MM01 | KKPAN | CK24 | KKF1 | KKF4 | MIGO | KB21N |
VA01 | VL01N | VF01 | KKS2 | KO88 | CKMLCP |
KE24 | CKM3N |